Skip to main content

CSIRO Clean Lab

Austruss assisted FKG to deliver a technically challenging building in a regional area, using DFMA solutions to solve the following: – the building needed to be easily removed from leased site at the end of lease – laboratory conditions required building to be air tight with low vibration tolerance.